A142 – 2004
Agreement Between Design-Builder and Contractor replaces
A491 – 1996 and consists of the Agreement and five
exhibits: Exhibit A, Terms and Conditions; Exhibit B,
Preconstruction Services; Exhibit C, Contractor’s
Scope of Work; Exhibit D, Determination of the Cost of
the Work; and Exhibit E, Insurance and Bonds. Unlike
B491 – 1996, A142 – 2004 does not rely on
A201 for its general conditions of the contract.
A142 – 2004
Agreement Between Design-Builder and Contractor contains
its own Terms and Conditions. A142 – 2004 obligates
the contractor to perform the work in accordance with the
Contract Documents, which include A142–2004 with
its attached exhibits, supplementary and other conditions,
drawings, specifications, addenda, and modifications.
Like A141 – 2004,
A142 – 2004 requires the parties to select the payment
type from three choices: (1) Stipulated Sum, (2) Cost of
the Work Plus Design-Builder’s Fee, and (3) Cost
of the Work Plus Design-Builder’s Fee with a Guaranteed
Maximum Price.
|